Loading http://www.ul.com/hongkong/

In approximately 1 second the redirection target page should load.
If it doesn't please select the link above.

UL Worldwide
North America
Europe
Denmark
France
Germany
Sweden
Switzerland
U.K.
Latin America
Asia Pacific
Argentina
Brazil
Mexico
Australia
India
Malaysia
New Zealand
Thailand
Hong Kong
Singapore
Learn more about the Product Mindset — a global collective consciousness reflecting how people feel about products — whether they are making and selling them or buying and consuming them.
more
UL Advantage is a revolutionary approach to safety certification, providing a faster, smarter, more flexible path to the proven benefits of UL certification.
more
Helping safe, compliant products to reach the global marketplace.
more
Delivering a breadth of services for the growing area of sustainability.
more
Leveraging UL's engineering, safety and performance expertise for the critical systems essential to our well-being.
more
Delivering product testing and assessments demanded by the global supply chain.
more
Offering training, advisory services and thought leadership to give businesses a competitive edge.
more
Share

Report or procedure document revisions

  1. Obtain a copy of the existing document via CDA; retain the name of the file that is downloaded from CDA.
  2. Eletronic report and procedure document attachments will be in a rich text format (.rtf). Retain this format, as it is a universal word processing format and must be uploaded as such into UL's systems
  3. Turn on the Track Changes feature of Microsoft Word:
    • Under Tools, select Track Changes.
    • Select Highlight Changes.

    • Select Track Changes while editing (all three boxes should be checked).
    • Select Options and make sure they are set as follows (these are the default settings):
    • Once the above is set and saved in the Word settings the first time, a short-cut alternative is to double-click the 'TRK' item in the bottom toolbar in Word to turn on the Track Changes feature. This acts as a toggle button; double-click again to turn off the feature.
  4. Make the desired changes. It is not necessary to change the revised date on the page being revised, since UL staff will do this for you. However, if desired, enter the revision date in ISO format (yyyy-mm-dd)
  5. Save the document, retaining the original document name as provided on CDA; close. Do not combine content groups (such as combining the description and test record), because this creates more work for both clients and UL.
  6. Submit the documents your usual UL contact.